Air-condition system of the SEDA 2 industrial plant (about 32,000 cubic metres)
We carried out the executive-constructive design and building of the new air-conditioning system of the SEDA 2 industrial plant in Arzano (NA): about 32,000 cubic meters.
The construction activities were carried out without interrupting the production activity.
The system uses all the heat sources already existing in the plant, thus obtaining considerable energy saving.